En suite shower room to wet room

Once again, the old suite was removed along with all tiles. We then altered any necessary pipework to suit the new sanitary. A stud wall was built at the back of the shower area to add a small shelving alcove. The ceiling was then plastered and 3x new LED spotlights were fitted, along with a new extractor.

A wet room tray was then installed into the floor, and the room was tanked using a waterproof tanking kit. It was then tiled from floor to ceiling including the floor, and then the new suite was fitted on completion of tiling.IMG_0110 IMG_0123 IMG_0140 IMG_0139 IMG_0137 IMG_0136 IMG_0136