A funky bathroom renovation

We removed the old bathroom suite, along with a large boxing which housed the soil stack (in picture where new bath is fitted). We then altered the soil stack externally to suit the new layout, along with all other pipework internally. Plastered all walls and ceiling, fitted 4x new LED spotlights in the ceiling along with a new extractor fan.

We then tiled all walls from floor to ceiling, along with the floor. The new vanity basin and toilet were then fitted along with a new towel radiator, shower and shower screen.

IMG_0101(1)IMG_0103IMG_0113IMG_0114IMG_0118IMG_0120

  • Linked In
  • Google

Leave a Reply