Here we removed the old bathroom suite,moved the boiler from the kitchen to the bathroom,made a cupboard around the boiler with shelving inside, and then re tiled the bathroom using a natural stone tile. Once tiled, a new suite was fitted. ← Previous Next → Leave a Reply Cancel replyYou must be logged in to post a comment.