The original master en suite was ripped out to leave us with a shell. Next, we insulated all walls by fixing someĀ insulation boards to them. We fitted 4x new spotlights to the ceiling and then skimmed the walls and ceiling. UFH was installed,the shower area was tanked, and then all walls and floor were tiled before fitting the new suite.
The tiles were a product of Porcelanosa.